• Issues throughout the lifecycle of a well are often overlooked and crucial to providing the right solution. Operating philosophy is important for diagnosis to provide a fit solution that delivers longevity in operation performance and productivity. VES delivers the optimization value.

  • VES provides decades of experience from global exposure in various forms of artificial lift and optimization applications. We focus on developed and proven technologies that enhance well productivity and maximizes ROI.

Plunger Lift

VES means optimized solutions:

  • Top quality equipment

  • Multi-pressure rated

  • Sidestream CSG applications

  • >300 BPD production rates

  • Bypass, conventional, 2-piece

  • Telemetry/SCADA capability

  • Algorithm control

  • Velocity sensing plunger arrivals

Plunger Drawing
Plunger Lift

Jet Lift

VES design and innovation delivers:

  • Concentric Jet Lift.

  • Reduced HP to operate

  • 0-2500 BPD

  • Easy operation

  • Low FBHP less than 10psi

  • Handles solids and gas extremely well

  • Rapid drawdown

  • Conventional Jet Lift for higher rates

Jet Lift

Gas Lift

VES, instrumental in R&D:

  • Plunger Assisted Gas Lift/Gas Assisted Plunger Lift (PAGL/GAPL)

  • B-Adaptor under packer

  • Poor-Boy

  • Conventional & side-pocket

  • Offshore/Onshore

Gas lift with dip tube perforations
CJL Wellhead

Cleanouts

VES JetSting cleanout system:

  • Excellent solids removal

  • CSG, conventional, vertical, horizontal

  • Cleanout, flowback or well testing

  • In existing tubing or casing

  • CT or rig deployed

  • Underbalanced/Balanced

  • Through stator

  • Low FBHP

Cleanout