Issues throughout the lifecycle of a well are often overlooked and crucial to providing the right solution. Operating philosophy is important for diagnosis to provide a fit solution that delivers longevity in operation performance and productivity. VES delivers the optimization value.
VES provides decades of experience from global exposure in various forms of artificial lift and optimization applications. We focus on developed and proven technologies that enhance well productivity and maximizes ROI.
Plunger Lift
VES means optimized solutions:
Top quality equipment
Multi-pressure rated
Sidestream CSG applications
>300 BPD production rates
Bypass, conventional, 2-piece
Telemetry/SCADA capability
Algorithm control
Velocity sensing plunger arrivals
Jet Lift
VES design and innovation delivers:
Concentric Jet Lift.
Reduced HP to operate
0-2500 BPD
Easy operation
Low FBHP less than 10psi
Handles solids and gas extremely well
Rapid drawdown
Conventional Jet Lift for higher rates
Gas Lift
VES, instrumental in R&D:
Plunger Assisted Gas Lift/Gas Assisted Plunger Lift (PAGL/GAPL)
B-Adaptor under packer
Poor-Boy
Conventional & side-pocket
Offshore/Onshore
Cleanouts
VES JetSting cleanout system:
Excellent solids removal
CSG, conventional, vertical, horizontal
Cleanout, flowback or well testing
In existing tubing or casing
CT or rig deployed
Underbalanced/Balanced
Through stator
Low FBHP